Ευρωπαϊκή Ένωση: Πρόσκληση ενδιαφέροντος για ενεργειακά έργα ως πιθανά έργα υποδομής κοινού ενδιαφέροντος
Ανάρτηση:
Mavromatidis Dimitrios
την
14 Ιουλ 2012
List of projects submitted to be considered as potential Projects of Common Interest (PCI).
For practical reasons the list has been divided into one list for electricity projects and one list for gas projects.
- Electricity projects [411 KB] List has been amended on 27 June 2012
- Gas projects [343 KB]
- Online questionnaire
N°
|
Countries
|
Project
|
Description
|
Planned date of completion
|
Project
promoter(s)
|
TYNDP
reference
|
E99
|
EL
|
New 400kV
OHL Bitola (MK) Elbasan (AL)
|
IPTO, ADMIE
|
51.239
|
||
E100
|
EL
|
New 400kV
substation in Lagadas(GR) and 400kV OHL to Fillipoi (GR)
|
IPTO, ADMIE
|
51.244
|
||
E101
|
EL
|
Patras
(GR) - 400kV Continental System (GR)
|
IPTO, ADMIE
|
52.24
|
||
E102
|
EL
|
New 400kV
substation in Megalopolis (GR) and OHL link to Patras (GR)
|
IPTO, ADMIE
|
52.241
|
||
E103
|
EL
|
New 400kV
substation in Korinthos (GR) and 400kV OHL to Megalopolis
(GR)
|
IPTO, ADMIE
|
52.242
|
||
E104
|
EL
|
Upgrade
OHL to 400kV Korinthos (GR) - Koymoundoyros (GR)
|
IPTO, ADMIE
|
52.243
|
||
E105
|
EL
|
"Attica - Crete - Rhodes", New
HVDC Interconnection Subsea Cable 2200 MW from Acharnes in Attica (GR) to
Rhodes island (GR) via Crete, Kasos and Karpathos islands.
|
State of the art low loss 600 kV HVDC (VSC
Dual Bipole configuration) transmission system of 2200 MW tranfer capacity
and 600 - 650 km subsea cable. This interconnection can be considered as part
of a "Crete" Cluster ("Crete 1" (promoted by the HTSO)
and "Crete 2" (promoted by RES developers) or individually.
|
2017
|
PPCR S.A.
|
Non-TYNDP
|
E106
|
EL
|
South Eastern - North Electricity Highway
(SENEH)
|
An overhead HVDC line (plus start and end
DC/AC substations as well as substations along the line) operating at 800 kV having
transfer capacity up to 6 GW. The new line will accommodate the transfer of
the energy produced by PV parks of the Helios project in Greece.
|
2019
|
Ministry of Environment, Energy and
Climate Change
|
Non-TYNDP
|
E107
|
EL
|
Egypt-Greece Interconnection Project
|
Concerns the installation of new wind
farms in Egypt (Suez area) with total capacity 3000MW (Energy production
appr. 12.000GWh/year) and the transmission of conventional and RES energy
from Egypt to Greece and export to other European countries. The interconnection
shall be implemeted via a suitable submarine HVDC link, with total capacity
3000MW.
|
2021
|
ELICA, EEHC
|
Non-TYNDP
|
E108
|
EL
|
Connection of Crete Island to the National
Power Grid of Greece via underwater cable
|
Development of 33 Wind Parks in all four
Prefectures of the island of Crete, with a power output of 1.077 MW and their
grid interconnection with the mainland of Greece through an underwater cable.
|
2017
|
TERNA Energy, S.A.
|
Non-TYNDP
|
E109
|
EL
|
Helios Interconnection - From Greece to
Germany (via Bulgaria, Romania, Hungary and Austria)
|
IPTO/ADMIE
|
Non-TYNDP
|
||
E110
|
EL
|
Kyklades 2 Pallini (GR) Andros (GR)
|
2016
|
ELICA, S.A.
|
Non-TYNDP
|
|
E111
|
EL
|
Kyklades 2 Pallini (GR) Karystos (GR)
|
2015
|
ELICA S.A. - TERNA Energy S.A.
|
Non-TYNDP
|
|
E112
|
EL
|
N. Aegean connection 5: Skyros (GR)
Larymna (GR)
|
RES investors
|
Non-TYNDP
|
||
E113
|
EL
|
"Kyklades", Pallini (GR) to
Andros (GR), New HVAC Interconnection Subsea Cable 200MVA
|
New HVAC Interconnection via Subsea Cable
with capacity 200MVA as part of a "Kyklades" Cluster ("Kyklades
1" (promoted by the HTSO) and "Kyklades 2" (promoted by RES
developers)) or individually.
|
2015
|
WIND PARK BABO VIGLIES S.A (representing
also: WIND PARK LEFKIVARI S.A., WIND PARK LOUKO S.A., WIND PARK AG.ONOUFRIOS
S.A., WIND PARK KILIZA S.A.)
|
Non-TYNDP
|
E114
|
EL
|
Pumped
Storage Complex with two upper reservoirs: Agios Georgios and Pyrgos
|
Two (2)
upper reservoirs will be constructed northeast, annual energy production:
264.000 MWh/year
|
2018
|
TERNA
Energy, S.A.
|
Non-TYNDP
|
E115
|
EL
|
South
Aegean DCLINK Connection
|
Kykladika
Meltemia S.A
|
Non-TYNDP/
Non-TSO
|
||
E116
|
EL
|
Lavrion
(GR) Syros (GR) (150 kV subsea)
|
IPTO,
ADMIE
|
TYNDP RgIP
250
|
||
E117
|
EL
|
Syros (GR)
Cyclades (GR) (150 kV subsea)
|
IPTO,
ADMIE
|
TYNDP RgIP
251
|
||
E118
|
EL
|
N. Aegean
connection 2: Larymna (GR) Chios (GR)
|
RES
investors
|
TYNDP RgIP
A137
|
||
E119
|
EL
|
N. Aegean
connection 1 Filippoi (GR) Limnos (GR)
|
RES
investors
|
TYNDP RgIP
A138
|
||
E120
|
EL
|
N. Aegean
connection 3: Chios (GR) Lesvos(GR)
|
RES
investors
|
TYNDP RgIP
A140
|
||
E121
|
EL
|
N. Aegean
connection 4: Limnos(GR) Lesvos(GR)
|
RES
investors
|
TYNDP RgIP
A141
|
||
E122
|
EL
|
Mainland
(GR) Crete 1 (GR) (submarine DC link)
|
2019
|
IPTO,
ADMIE
|
TYNDP RgIP
A142
|
|
E123
|
EL
|
Crete 2:
Acharnes (GR) - Crete 2 (GR)
|
2020
|
ELICA, S.A.
|
TYNDP RgIP
A143
|
|
E124
|
EL
|
N. Aegean
connection 6: Chios (GR) Ikaria-Samos-Kos (GR)
|
RES
investors
|
|||
E125
|
EL/BG
|
New 400kV
OHL Maritsa East 1 (BG) - N.Santa (GR)
|
IPTO,
ADMIE, TSO Bulgaria
|
51.256
|
||
E126
|
EL/BG/RO
|
Cluster BG
North-South Grid Enhancement
|
Two new
high-voltage transmission lines, as follows: 1. OHL 400kV s/s
"Vetren" - s/s "Blagoevgrad", 100 km. 2. OHL 400kV s/s
"Tsarevets" - s/s "Plovdiv", 150 km.
|
2017
|
Electricity
System Operator
|
Non-TYNDP
|