Ευρωπαϊκή Ένωση: Πρόσκληση ενδιαφέροντος για ενεργειακά έργα ως πιθανά έργα υποδομής κοινού ενδιαφέροντος

List of projects submitted to be considered as potential Projects of Common Interest (PCI).
For practical reasons the list has been divided into one list for electricity projects and one list for gas projects.

Η λίστα των έργων που αφορά την Ελλάδα δινεται παρακάτω:

Countries
Project
Description
Planned date of completion
Project
promoter(s)
TYNDP reference
E99
EL

New 400kV OHL Bitola (MK) Elbasan (AL)

IPTO, ADMIE
51.239
E100
EL

New 400kV substation in Lagadas(GR) and 400kV OHL to Fillipoi (GR)

IPTO, ADMIE
51.244
E101
EL

Patras (GR) - 400kV Continental System (GR)

IPTO, ADMIE
52.24
E102
EL

New 400kV substation in Megalopolis (GR) and OHL link to Patras (GR)

IPTO, ADMIE
52.241
E103
EL

New 400kV substation in Korinthos (GR) and 400kV OHL to Megalopolis
(GR)

IPTO, ADMIE
52.242
E104
EL

Upgrade OHL to 400kV Korinthos (GR) - Koymoundoyros (GR)

IPTO, ADMIE
52.243
E105
EL
"Attica - Crete - Rhodes", New HVDC Interconnection Subsea Cable 2200 MW from Acharnes in Attica (GR) to Rhodes island (GR) via Crete, Kasos and Karpathos islands.
State of the art low loss 600 kV HVDC (VSC Dual Bipole configuration) transmission system of 2200 MW tranfer capacity and 600 - 650 km subsea cable. This interconnection can be considered as part of a "Crete" Cluster ("Crete 1" (promoted by the HTSO) and "Crete 2" (promoted by RES developers) or individually.
2017
PPCR S.A.
Non-TYNDP
E106
EL
South Eastern - North Electricity Highway (SENEH)
An overhead HVDC line (plus start and end DC/AC substations as well as substations along the line) operating at 800 kV having transfer capacity up to 6 GW. The new line will accommodate the transfer of the energy produced by PV parks of the Helios project in Greece.
2019
Ministry of Environment, Energy and Climate Change
Non-TYNDP
E107
EL
Egypt-Greece Interconnection Project
Concerns the installation of new wind farms in Egypt (Suez area) with total capacity 3000MW (Energy production appr. 12.000GWh/year) and the transmission of conventional and RES energy from Egypt to Greece and export to other European countries. The interconnection shall be implemeted via a suitable submarine HVDC link, with total capacity
3000MW.
2021
ELICA, EEHC
Non-TYNDP
E108
EL
Connection of Crete Island to the National Power Grid of Greece via underwater cable
Development of 33 Wind Parks in all four Prefectures of the island of Crete, with a power output of 1.077 MW and their grid interconnection with the mainland of Greece through an underwater cable.
2017
TERNA Energy, S.A.
Non-TYNDP
E109
EL

Helios Interconnection - From Greece to Germany (via Bulgaria, Romania, Hungary and Austria)

IPTO/ADMIE
Non-TYNDP
E110
EL

Kyklades 2 Pallini (GR) Andros (GR)
2016
ELICA, S.A.
Non-TYNDP
E111
EL

Kyklades 2 Pallini (GR) Karystos (GR)
2015
ELICA S.A. - TERNA Energy S.A.
Non-TYNDP
E112
EL

N. Aegean connection 5: Skyros (GR) Larymna (GR)

RES investors
Non-TYNDP
E113
EL
"Kyklades", Pallini (GR) to Andros (GR), New HVAC Interconnection Subsea Cable 200MVA
New HVAC Interconnection via Subsea Cable with capacity 200MVA as part of a "Kyklades" Cluster ("Kyklades 1" (promoted by the HTSO) and "Kyklades 2" (promoted by RES developers)) or individually.
2015
WIND PARK BABO VIGLIES S.A (representing also: WIND PARK LEFKIVARI S.A., WIND PARK LOUKO S.A., WIND PARK AG.ONOUFRIOS S.A., WIND PARK KILIZA S.A.)
Non-TYNDP
E114
EL
Pumped Storage Complex with two upper reservoirs: Agios Georgios and Pyrgos
Two (2) upper reservoirs will be constructed northeast, annual energy production: 264.000 MWh/year
2018
TERNA Energy, S.A.
Non-TYNDP
E115
EL

South Aegean DCLINK Connection

Kykladika Meltemia S.A
Non-TYNDP/ Non-TSO
E116
EL

Lavrion (GR) Syros (GR) (150 kV subsea)

IPTO, ADMIE
TYNDP RgIP 250
E117
EL

Syros (GR) Cyclades (GR) (150 kV subsea)

IPTO, ADMIE
TYNDP RgIP 251
E118
EL

N. Aegean connection 2: Larymna (GR) Chios (GR)

RES investors
TYNDP RgIP A137
E119
EL

N. Aegean connection 1 Filippoi (GR) Limnos (GR)

RES investors
TYNDP RgIP A138
E120
EL

N. Aegean connection 3: Chios (GR) Lesvos(GR)

RES investors
TYNDP RgIP A140
E121
EL

N. Aegean connection 4: Limnos(GR) Lesvos(GR)

RES investors
TYNDP RgIP A141
E122
EL

Mainland (GR) Crete 1 (GR) (submarine DC link)
2019
IPTO, ADMIE
TYNDP RgIP A142
E123
EL

Crete 2: Acharnes (GR) - Crete 2 (GR)
2020
ELICA, S.A.
TYNDP RgIP A143
E124
EL

N. Aegean connection 6: Chios (GR) Ikaria-Samos-Kos (GR)

RES investors

E125
EL/BG

New 400kV OHL Maritsa East 1 (BG) - N.Santa (GR)

IPTO, ADMIE, TSO Bulgaria
51.256
E126
EL/BG/RO
Cluster BG North-South Grid Enhancement
Two new high-voltage transmission lines, as follows: 1. OHL 400kV s/s "Vetren" - s/s "Blagoevgrad", 100 km. 2. OHL 400kV s/s "Tsarevets" - s/s "Plovdiv", 150 km.
2017
Electricity System Operator
Non-TYNDP

0 σχόλια

Δημοσίευση σχολίου

Δημοσίευση σχολίου